This successful transformation unifies two buildings into a cohesive estate that redefines modern office space using innovation, sustainability, and employee wellbeing as concept pillars.
Now complete and recognised as BCO Corporate Workplace Regional Winner for North of England, North Wales and Northern Ireland. The project was delivered in two stages: Phase 1 saw the internal fit out of 950 sqm of flexible serviced workspaces, while Phase 2 delivered a Cat A and Cat B fit-out of 115,000 sq. ft unification of Castle House and West One through a striking architectural extension and a central wellness-focused courtyard.
In Phase 1, 3DReid provided full design services for the initial fit out of 950 sqm of serviced workspaces within West Village in the heart of Leeds.
The space was transformed into a versatile workspace with 21 fully fitted and furnished flexible offices of a variety of sizes. A generous communal amenity space serves as a collaborative, community space with a beverage counter, break out areas, lounge and short stay work areas. The modern concept accommodates a diverse range of businesses and operational needs. Seamlessly combining office suites, workspaces, meeting rooms and retail space all under one roof.
Central to the design is the Wellness Hub, an intervention dedicated to the physical and mental health of the community.
West Village has well-equipped fitness studio and large, premium changing facilities and large secure cycle storage.
The central courtyard and throughout the building features biophilic integration by I Want Plants to improve air quality and visual relief.
Communal lounges, open plan transition zones sculptural lighting and considered artwork fosters a sense of community and reducing isolation found in traditional corporate settings.
West Village embodies 3DReid’s commitment to a “fabric first” approach, prioritising the reuse of existing structures to significantly reduce embodied carbon. By retaining and refurbishing Castle House and West One, the design maximises the lifecycle of the original materials while integrating a modern, energy-efficient extension.
The development successfully achieved an EPC A rating, supported by high-performance building envelopes and intelligent MEP systems that ensure long-term operational efficiency. Beyond the building’s walls, the design facilitates a shift in transport habits through extensive cycle-to-work infrastructure, supporting both the health of the occupants and the city’s wider net-zero ambitions.